Seatricity - Wave Energy

+44 1326 352 362

enquiries@seatricity.com

Seatricity has completed installation of its next generation Oceanus 2 at Wave Hub 10 miles off the coast of Hayle. Marine operations were completed last week with the connection of Oceanus 2 to the 80t subsea reaction anchor. The device will remain at Wave Hub for the following months undergoing commissioning of the communications and …

Read more

Steve Hardy has covered the installation of Oceanus 2 at Wave Hub on ITV West Country’s evening news slot. Bob Tillotson had an eventful day being interviewed in Falmouth by both ITV and BBC Spotlight whilst preparing for the departure of Oceanus 2 under tow by Seatricity’s installation vessel Ocean Enterprise. “It’ll be the first …

Read more

Severn Subsea Technologies (SST) has designed and manufactured a control and data acquisition system for the Oceanus 2 device that will be installed at Wave Hub this summer. The systems are mounted on the buoy and transmit via radio link to a shore-based location at the St Ives Coast Watch Facility. The unit can then …

Read more

Seatricity has completed construction of its next generation Oceanus 2 at AP Falmouth. The wave energy converting device – a 10m diameter floating ring made from marine grade aluminium – will be the first device to be deployed for testing at Wave Hub, the offshore renewable energy test facility 10 miles off the coast of …

Read more

Pioneering wave energy developer Seatricity is celebrating the start of constructing its new Oceanus 2 device with leading marine fabricator A&P Falmouth following the highly successful testing of its Oceanus 1 prototypes.

Read more

Bob Tillotson has been interviewed by ITV West Country News following the announcement that Seatricity will take a berth at Wave Hub.   Please follow this link for the ITV website……..  

Read more

Leading wave energy company Seatricity is to develop a 10MW array over the next two years at Wave Hub, the offshore renewable energy test facility in Cornwall.UK based Seatricity plans to deploy its second generation device at Wave Hub next year before building out to a full scale grid-connected array in 2015. Our first generation …

Read more
Page 3 of 3123